---
title: What to expect from the new public sector BIM adoption requirements?
description: Introduction to the Irish Public Sector BIM Adoption Requirements & The Role of an Information Manager
---

[News and case studies ](https://www.fexillon.com/news-and-case-studies)

# [What to expect from the new public sector BIM adoption requirements?](https://www.fexillon.com/news-and-case-studies/what-to-expect-from-the-new-public-sector-bim-adoption-requirements)

 Written by [Admin](https://www.fexillon.com/news-and-case-studies/author/admin) | Jun 5, 2024 2:25:58 PM

From January 2024, consultants engaged to design and oversee the construction of Irish public works contracts with a value in excess of €100m have Building Information Modelling (BIM) requirements included in their scope of service.

[View full post](https://www.fexillon.com/news-and-case-studies/what-to-expect-from-the-new-public-sector-bim-adoption-requirements)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Admin"
  },
  "dateModified" : "2025-04-30T08:13:29.794Z",
  "datePublished" : "2024-06-05T14:25:58Z",
  "headline" : "What to expect from the new public sector BIM adoption requirements?",
  "image" : {
    "@type" : "ImageObject",
    "height" : 628,
    "url" : "https://25493058.fs1.hubspotusercontent-eu1.net/hubfs/25493058/for%20blog-bim%20paper.png",
    "width" : 869
  },
  "mainEntityOfPage" : "https://www.fexillon.com/news-and-case-studies/what-to-expect-from-the-new-public-sector-bim-adoption-requirements",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "News and case studies"
  }
}
```